81. Deputy Brian Stanley asked the Minister for Housing, Local Government and Heritage if his Department will provide sufficient funding to Uisce Éireann to upgrade the wastewater systems in towns and villages within the wider Dublin commuter belt, which now includes Laois, where lands have been rezoned; and if he will make a statement on the matter. [48497/26]
Sentiment score: 0.01
There is a request, which I have no problem with, that local authorities in the wider Dublin catchment area zone land for a large increase in the population and the number of dwellings. That needs infrastructure. However, given the tight budgets that local authorities operate with, will funding be provided, particularly through Irish Water, for the infrastructure required for wastewater and water supply?
Sentiment score: -0.11
Where does the responsibility lie? It needs to be clearer. There was a policy decision by the Department to zone these extra lands. In the case of Laois, as the Minister knows, substantial extra lands have been zoned in the last two weeks for an increase of over 8,000 houses, which will bring an increase of approximately 25% in the population in four or five years. They cannot all be in Portlaoise. I understand, and I support it to solve the housing crisis, that we need to strengthen villages and smaller towns to provide an option for people to live in a village structure where they are close to pubs, shops, community centres and schools. This means upgrading the water system. Uisce Éireann earmarked four villages in Laois for its small villages and towns scheme. One has been done in Ballyroan and I welcome this but those in Borris-in-Ossory, Ballinakill and Ballybrittas have not. They were all earmarked by Uisce Éireann. Somebody needs to intervene to tell Uisce Éireann that these need to be upgraded. In the case of Borris-in-Ossory, 160 extra houses are planned for extra land. There are 56 planned for Ballinakill and 437 for Graiguecullen. These cannot be provided without the infrastructure.
Sentiment score: 0.08
I appreciate what the Minister has said about the ones being provided by developers. The Tánaiste in reply to me said a lot will be provided by developers. It is okay if this can be done but the Minister and I know that Uisce Éireann is reluctant to take in charge infrastructure provided by developers. I can show the Minister an example in Laois which has been held up because of this. There has been a lot of back-and-forth with Uisce Éireann, local authorities and the Department on this. As far as I am aware, according to the most recent information I have, that nut has not been cracked yet. The cases of Graiguecullen, Borris-in-Ossory, where I welcome the progress, and Ballinakill are all in the red. They have been labelled as red by Uisce Éireann in terms of wastewater; in other words, no development can take place. The lands and the extra houses in each of these areas that I mentioned are in addition to what is already under construction or what is already zoned. We need to strengthen our villages and towns. We cannot put everybody in Portlaoise. The Minister and Minister of State who visited Laois know what is happening with private, public and local authority housebuilding. They saw the figures for zoning in the plan two weeks ago. Laois is not behind the curve but we need input from the Government and Uisce Éireann.
Sentiment score: 0.07