Kevin Boxer Moran

Overall sentiment: 0.11
Back to Debate

I thank the Deputy. Rathfarnham Castle was built in 1583 and throughout its long and rich history has been owned by Archbishop Adam Loftus, the founder of Trinity College; Speaker Conolly; and the Jesuit Order. The castle is one of Ireland's oldest Elizabethan houses. For most of the 20th century, the castle was owned and occupied by the Jesuits. It was declared a national monument and purchased by the State in 1987. The OPW is responsible for the care and management of Rathfarnham Castle while the lands are managed by South Dublin County Council. Since 1987, the OPW has undertaken an extensive programme of conservation and restoration to secure the historic fabric of the building and has also undertaken works to improve access to the building with the installation of a lift and ramps. As the Deputy has noted, the exterior of the castle is showing signs of wear and tear. The exterior of Rathfarnham Castle is finished with a substance called lime harling, which was last renewed in 2010. This would normally be expected to last many decades, so detailed assessments have taken place to understand the cause of the wear and tear. To address the issue in the short term, a sample of the north facade was cleaned in June 2024 to assess whether cleaning the facade was feasible and would be of benefit to the building. Cleaning and repair works are being progressed after a completed sample proved effective. This is a preventative measure to maximise the lifespan of the existing wet dash and lime finish. This will improve the appearance of the castle. In the longer term, however, a full refinish of the exterior is required, along with repair works to prevent this wear and tear. This is a large works project that will necessitate full scaffolding being erected around the building. However, there is a short seasonal window, along with weather conditions, in which the lime harling finish can be applied and these works are not expected to take place until 2027. Funds have been allocated to undertake this project, with a senior architect assigned to oversee the design and completion.

Sentiment score: 0.20

To be honest, I cannot say. However, I visited the castle a number of weeks ago and saw at first hand exactly the damage caused. I will take back with me that the Deputy got a response that it would be done in 2025 and revert to him in writing. I will pursue it because I fell in love with the castle when I went there. It is a fabulous facility.

Sentiment score: 0.35

In defence of why it did not happen in 2025, and as I said in my report, it is due to weather. The type of material we use to do with the castle is all down to weather. If we do not get the weather, we cannot do it.

Sentiment score: 0.03

I am not trying to cover for why it was not done but I know it is seasonal.

Sentiment score: 0.00

I have this right around the country where people, such as the Deputy, raise the question, but in defence of my Department, I have to say we have a very small window in which to do it. I will come back to the Deputy in writing to give it more flesh.

Sentiment score: 0.08

The Deputy has raised this in the committee and here in the House. As I said to him, a judicial review held up that whole scheme. We got consent and were ready to go, and then came the judicial review. Once it comes through the planning process, we will be on the ground. As I explained to the Deputy, I am working extremely hard to try to do this. He can play a part by going to talk to the people who bring these objections to see if we have done everything required so that, when it comes out, we are not faced with another objection and it is delayed again. It is unfair to say the OPW and my Department have not worked tirelessly to try to deliver this scheme. I know the pressure the Deputy is facing over the length of time it has taken. Once there is a judicial review, it holds up the entire planning process. He knows how long this has been going on and so do I. Let us see what happens in the next few weeks and then we can get working.

Sentiment score: -0.03

The OPW and Clare County Council have an extensive programme of flood risk management works across Clare during 2025. Clare County Council is currently leading the delivery of flood relief schemes in County Clare in the townlands of Springfield, Kilkee and Shannon, Bunratty and Kilrush. These schemes are funded by the OPW from the Government's €1.3 billion investment in flood measures under the national development plan to 2030. Construction of the €5.2 million Springfield flood relief scheme to protect 21 properties is nearing completion. The completion of this scheme is being informed by the groundwater report. The €8.5 million Kilkee flood relief scheme to protect 134 properties was submitted for planning during 2024 and detailed design for the construction of the scheme is being progressed. Work to finalise the design of the Shannon flood relief scheme to protect 1,400 properties is continuing and the scheme option is scheduled to be submitted for planning approval in quarter 2 2026. The OPW is working with Clare County Council on a potential flow path in Bunratty, which may increase the knowledge of the flood risk in this area to inform the feasibility study of the scheme. Clare County Council is finalising tender documents for technical consultancy services for the Kilrush flood relief scheme and plans to issue these later this year. Since 2009, the OPW has approved funding under the minor flood mitigation works and coastal protection scheme of €3.8 million to County Clare for some 42 projects. Clare County Council proposes to carry out coastal minor works as part of the 2025 programme at Aughinish Island, north Clare, Marine Parade, Kilkee and Ballynacally, and Newmarket-on-Fergus. The works include underpinning and strengthening of the existing sea walls and reinforcement of existing earthen embankments. Clare County Council has also appointed consultants to carry out a condition survey and performance upgrade options review of the tidal barrage at Clarecastle. Non-coastal works at Gullet Cross and Mountcashel are also due to be carried out in 2025.

Sentiment score: 0.28

I could not agree more. As the Deputy said, there is a lot of good and positive stuff happening in County Clare. The Department is working closely with the local authority on the local drainage scheme and it is supported by the Government, which is very important. I am looking closely at the issue the Deputy spoke about. I am looking at vegetation clearing, getting into the rivers and working with the local authorities. I hope to have good news on that in the near future. I have been working closely with local authorities and elected representatives up and down the country, all of whom face the same problem. They tell me that the rivers are never cleaned and this is not done when flooding occurs. However, it means working with the local authorities and we also have to comply with environmental rules. I am working on that and will hopefully have good news in the near future for the local authorities.

Sentiment score: 0.20

I could not agree more with the Deputy on insurance. My job is to protect communities up and down the country. My officials and I hope to meet the Minister of State, Deputy Troy, on this. The Government is very much focused on this issue and we understand it. I get it, the same as the Deputy gets it. I get requests to write letters of comfort as well and I wonder what it is all about. My Department has spoken with the Minister of State's Department. We are working closely on this to see if we can deliver something.

Sentiment score: 0.19

The Government has committed to investing a sum of €81 million for the design and implementation of flood relief schemes for County Kerry. Tralee, Kenmare, Abbeydorney and Banna are all in the first tranche of schemes to be progressed, with Dingle, Killarney, Ballylongford, Listowel and Castleisland-Tullig in the second tranche. Engineering and environmental consultants were appointed in quarter 3 2021 to deliver a flood relief scheme for Tralee. Emerging options are scheduled to be identified in quarter 4 2025 and will be made available to the public for consultation. It is expected that this scheme will be submitted for planning in quarter 4 2026. Engineering and environmental consultants were appointed in quarter 2 2022 to deliver a flood relief scheme for Kenmare. Assessing the flood risk in Kenmare is complex and it is expected the design option will be made available to the public for consultation in mid-2026. Works on the Finnihy river were completed in early 2024 to mitigate the flood risk. While the Listowel scheme is not in the first tranche of projects to be progressed, the OPW, through Kerry County Council, is investing €2 million for advance measures. Following a flood event in Listowel in November 2024, Kerry County Council engaged consultants to provide a report on the flood event. The findings were presented to Kerry municipal district on 30 April 2025 and are now available to the public. Kerry County Council has discussed the findings of this report with the OPW. The council recently requested the consultant to assess the delivery programme for the recommended short-term measures, including rising the embankments at Killacrim. Once complete, this assessment, which may require hydraulic modelling, will inform a meeting with the OPW in the coming weeks to discuss implementation and funding mechanisms for any viable measures. Any requirement for environmental assessments for these works will inform the timeline for their delivery.

Sentiment score: 0.11

As I said, €81 million in investment has been given to Kerry County Council. The Deputy talked about coastal protection. Since 2009, €4.2 million has been given to the minor flood mitigation and coastal protection scheme. This also includes €2.9 million for coastal erosion work. My Department is very much working with the local authority, particularly in Kerry. We know too well the issues people are facing right around the country, not just down in Kerry. I will visit Kerry in the not-too-distant future to look at the situation and talk to people. When I was last in government I worked very closely with the local authority in Kerry and we delivered a number of projects. I look forward to looking at those and also the areas Deputy Cahill raised today. The Minister outlined major infrastructure problem areas and the backlog in delivering major schemes. I am looking at this in my Department to see if we can streamline how we deliver schemes in terms of the planning process. As I said earlier, 11 years to deliver a scheme is too long. There are constraints that we need to comply with and deliver on. I will work closely with the Deputy.

Sentiment score: 0.01

I know too well the problems people face. There is nothing as bad as getting up in the morning or going to bed at night when there is rain or wind. I know too well the suffering, worry and stress this causes whole families and the people around them. The Government is very much committed to delivering schemes. As I said, in the last few years we delivered between €68 million and €74 million. By the end of this year, a total of €93 million will be delivered through schemes. That shows that in the few months of this Government, with the help of the Minister, Deputy Chambers, and the finances we have, we are delivering for the people. There are backups and delays we have to work through to see, as I said at the outset, whether we can slimline the planning process to try to deliver faster for the people. I know too well what the Deputy explained today. I have seen it first hand in my town of Athlone. Now that the flood defences are almost complete in Athlone, I see the pressure that is off the people and what it does for businesses. It gives people quality of life. I look forward to meeting the Deputy in Kerry.

Sentiment score: 0.05

I will ask my line manager if he will organise a helicopter because I have had so many requests today that I will be flying.

Sentiment score: 0.00